Snagging Reports

How to Write a Snagging Report: UK Format

A snagging report records defects and unfinished work found in a home. Give each issue a location, a clear description and supporting photos where useful. Organise the entries by room so your house builder can understand what you found. Keep a copy of the report and any replies.

6 min readUpdated 2026

Why a clear snagging report helps

A snagging report is only as useful as it is clear. A list organised by room, with one issue per entry and a photo where useful, is easier for your house builder to read and act on.

What to include in every snagging report

  • Property address and plot number
  • Date of inspection
  • Clear description of each defect
  • Supporting photograph per issue
  • Exact room and location reference
  • Issue category (cosmetic, structural, electrical etc.)
  • Severity or urgency rating
  • Your contact details

For a ready-made table with these columns, copy our snagging list template. For the basic definition and examples, read what snagging means.

How to describe defects clearly

Vague descriptions produce vague responses. Instead of writing "wall looks bad," write "Uneven paint finish on north-facing wall in master bedroom, approximately 60cm x 40cm area showing visible brush marks and missed section near window." The more specific, the harder it is to dismiss.

Weak
"Paint issue in bedroom"
"Floor problem"
"Window broken"

Record each issue clearly

For each issue, note the room, where it is and what you observed. Keep the original photos and a copy of the report you send to your house builder. When you are ready to send it, see how to report snags to your house builder.

Frequently asked questions

Keep your snag list in Snagr.

Record each issue with a note or photo and its location, even without signal. Free to snag. Share your report from £5.99 per property, no subscription.